Introduction - Enclosures

1. 3D Model

enclos-1.PNG

2. Layout of Panel

Note: Click on the image for details

gearplate.PNG

3. Maintenance

Important Precautions: -

​

READ this manual before operating or servicing this equipment.

​

  • ALWAYS remove power and wait at least 30 seconds before connecting / disconnecting any internal harnesses. Failure to observe these precautions may result in damage to, or destruction of the equipment.

  • ALWAYS take proper precautions when handling static sensitive devices.

  • SAVE this manual for future reference.

  • DO NOT allow untrained personnel to operate, clean, inspect, maintain, service or tamper with this equipment. 

  • DO NOT connect or disconnect any digital or analogue components to the equipment with power connected or damage may result.

 

Refer click the below Maintenance Schedule for Control Panel.

​

Maintenance Schedule

4. Risk Assessment

Risk Assessment or HAZOP, or a Hazard and Operability Study, is a systematic way to identify possible hazards in a work process. In this approach, the process is broken down into steps, and every variation in work parameters is considered for each step, to see what could go wrong. 

​

Please refer the below attachment for HAZOP Document.

​

​