top of page
BAR Logo #1_edited_edited.png

Introduction - Main Drive Assembly

1. 3D Model

  • Product Contact Parts             -   MS Powder Coated RAL 7035

  • Product Non-Contact Parts     -   SS304

​

16256-1701 Main Drive Assembly-2.JPG

2. Main Drive Operation

The Main drive transfers the Cartons from carton Place position to Outfeed Conveyor. the products are manually loaded into cartons on Main Drive. after loading the products, the cartons are moved to Tuck-in Unit, it helps to close the major and minor flaps of the cartons. The Filled cartons are moved to Outfeed Conveyor.

3. Maintenance

Important Precautions: -

​

READ this manual before operating or servicing this equipment.

​

  • ALWAYS remove power and wait at least 30 seconds before connecting / disconnecting any internal harnesses. Failure to observe these precautions may result in damage to, or destruction of the equipment.

  • ALWAYS take proper precautions when handling static sensitive devices.

  • SAVE this manual for future reference.

  • DO NOT allow untrained personnel to operate, clean, inspect, maintain, service or tamper with this equipment. 

  • DO NOT connect or disconnect any digital or analogue components to the equipment with power connected or damage may result.

 

Refer click the below Maintenance Schedule for Plucker Assembly.

​

Maintenance Schedule

4 Spare Parts

Note: Click on the Description for details about Spare parts

  13.      NTN UC205-25                                                   P107-0250                                                                      X            

  14.      NTN 6003LLU                                                    P100-6003                                                                       X

  15.      NTN Ball Bearing Set Screw type UC204-20    P107-0200                                                                       X

  16.      NTN 6007LLU                                                    P100-6007                                                                      X

  17.      IGUS NW-02-40 Slider                                       P271-1227                                                                      X

  18.      NTN UC203-17                                                  P107-0170                                                                      X

  19.      SKF 6201-2RS​                                                   P105-6201                                                                      X

  20.      THK PHS 06 Rod End                                       P165-1006                                                                      X

  21.      THK PHS 06 LH Rod End                                 P165-1106                                                                      X

 22.       NTN 6807LLU                                                   P100-6807                                                                      X

 23.       SKF 6004-2RS                                                  P105-6004                                                                      X

 Sr.No.   Description                                                        Part No.                              Critical Spare             Recommended

                                                                                                                                                                             Spare

 24.       SKF 6001-2RS                                                  P105-6001                                                                      X

5. Risk Assessment

Risk Assessment or HAZOP, or a Hazard and Operability Study, is a systematic way to identify possible hazards in a work process. In this approach, the process is broken down into steps, and every variation in work parameters is considered for each step, to see what could go wrong. 

​

Please refer the below attachment for HAZOP Document.

​

​

6 Troubleshootng

Troubleshooting is the process of identifying, diagnosing, and resolving problems or issues that arise in various systems, equipment, or processes. it involves a systematic approach to problem-solving, using a combination of analytical, technical, and problem-solving skills.

​

The first step in troubleshooting is to identify the problem. This can involve gathering information about the issue, including when it started, what systems or equipment are affected, and any error messages or symptoms that are observed. Once the problem is identified, the next step is to diagnose the root cause. This involves analyzing the information collected and using technical knowledge to determine what is causing the issue. After the root cause is identified, the next step is to develop a plan for resolving the issue.

​

Refer the below about the Troubleshooting.

​

bottom of page