Operation of Machine
Introduction- Enclosure
1. Panel Dimensions
2. Panel Dimensions (Control Panel)
3. Panel Dimensions (Checkweigher)
2. Gear plate Layout
Note: Click on the components name for the Manuals

Gear plate Layout 2

Gear plate Layout (Checkweigher)
3. Maintenance
Important Precautions:
​
READ this manual before operating or servicing this equipment.
​
-
ALWAYS remove power and wait at least 30 seconds before connecting/disconnecting any internal harnesses. Failure to observe these precautions may result in damage to, or destruction of, the equipment.
-
ALWAYS take proper precautions when handling static-sensitive devices.
-
SAVE this manual for future reference.
-
DO NOT allow untrained personnel to operate, clean, inspect, maintain, service, or tamper with this equipment.
-
DO NOT connect or disconnect any digital or analogue components to the equipment with power connected, or damage may result.
Click the below maintenance schedule for the control panel.
​
4. Electrical Spare List
Note: Click on the Description for details about Spare parts
3.
5.
Description
Consumables
Essential
Recomended
​
Sr No.
1.
2.
4.
6.
7.
8.
1
1
1
2
5
1
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
1
1
2
5
2
10
1
5
5
4
2
4
1
1
22.
23.
24.
25.
2
2
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
1
1
1
1
1
1
1
1
1
